Certificate of inspection and categorization of an object 2021


Procedure

The inspection procedure involves a visual type of assessment of the property in question.

The results of the actions performed must be presented in documentary form so that the act acquires legal force and can be used officially.
Most often, in such cases, a separate document called “Building Inspection Report” is filled out.
The form of the act and its content may vary, depending on several factors. First of all, the presence of features is dictated by what specific task is set when drawing up the act.

The second reason for the appearance of differences is combined with the scope of application (operation) of the structure being examined: residential type; production type; for trading plans; in the form of a warehouse; and so on. Taking into account exactly which point a certain structure from the listed list can be attributed to, the requirements depend.

Grounds for execution of the act of demolition of OKS

The act is carried out for the following reasons:

  1. The owner decided to voluntarily demolish a capital facility on his land plot.
  2. The building collapsed due to force majeure, such as fire.

If, as a result of an accident, the building is partially destroyed, but cannot be restored, then before ordering an act, the building must be completely demolished.

Only a cadastral engineer has the right to carry out an inspection report. He certifies with his personal seal that the building no longer exists, and bears administrative and, in special cases, criminal liability for this.

The subject of the inspection report is any capital construction object that is registered in the cadastral register and the right to which is registered. It is permissible to prepare an act to deregister buildings whose rights have never been registered.

The tax on a destroyed building will cease to be charged only from the moment it is removed from the cadastral register. If the property was liquidated several years ago, but this has not been legally formalized, property taxes will still be due as usual.

Features of compilation

To fill out, use a standard form according to the sample. It records the following information:

  • date of inspection;
  • a complete list of the commission members who carried out the inspection, indicating their initials and positions;
  • date and number of the decree for the creation of the commission;
  • the period during which the commission must carry out the inspection;
  • in the text it is necessary to clarify the detailed type of parameters of the object, which will help to make a reasonable assessment of its condition.

To do this, fill out a standard form in the document with the following information:

  1. name and exact location of the structure or its individual part;
  2. a full description of the defects noticed;
  3. work required to correct problems;
  4. recommended time frame for carrying out repair and restoration work.

As a result, the document is signed by all members of the commission and approved by the management of the enterprise.

Who is responsible

In order to inspect the building, a commission group is recruited from employees with engineering and construction education who can make a correct assessment. The following factors may warrant an inspection:

  • the need for a scheduled inspection;
  • calculation of emergency results;
  • inspection before major repairs or reconstruction of all or part of the house.

The approved act specifies a set of measures that will need to be taken to eliminate all defects . Responsible officials must also be established for carrying out repair and restoration work within a certain time frame.

Manipulation

ATTENTION! Technical inspection is a fairly broad concept that can include a huge range of manipulations carried out during the inspection of a building or structure.

These may include a regular visual inspection of the facade and interior of the building, attic, basement, as well as inspection of engineering systems: water supply, sewerage, and so on. It all depends on the goals and objectives that are set for those who perform this check.

What is an inspection report?

This document contains information about the customer and performer of the work, the object having a cadastral number, and the documents on the basis of which the act was prepared: for example, an application from the owner for voluntary demolition.
An integral part of the act is the conclusion of the cadastral engineer. There is no graphic part in the act, and the engineer’s visit to the area is limited to inspecting the site. If there are many buildings, the engineer, using documents (for example, a registration certificate), determines the location of the demolished building and, in conclusion, confirms its absence.

Sample inspection report:

Commission members

Most often, a whole commission is called in to conduct a full inspection of the building. The composition of the commission group is selected based on the circumstances under which the control audit is carried out.

If this is the acceptance of a newly constructed building, then representatives of several companies that participated in the construction are called to the commission. And if a structure that has long been owned by a certain company is inspected (for example, after winter or an autumn inspection), then the commission will be formed from employees of the enterprise.

IMPORTANT! In any case, the commission should include at least 3 specialists, preferably from different professional fields. And if necessary, it may also include an independent expert.

Formation of a verification commission

Let us immediately note that the inspection of the objects of the transaction cannot be carried out by one person, since he will not be able to fully give a qualitative assessment of the goods. In addition, one inspector may simply make a mistake, which will subsequently cost the company tens of thousands of rubles/dollars.

Therefore, to carry out an inspection by the parties (most often, the buying party), a special commission is created, each participant of which will not only give their qualified opinion on the issue, but will also check the statements of their colleagues. The person responsible for the commission is usually chosen by the head of the organization.

Expert opinion

Oleg Ustinov

Practicing lawyer, author of the website “Legal Ambulance”, one of the co-founders of the “Our Future” foundation.

Thus, the verification commission must include at least two specialists. To carry out a more thorough and effective audit, it is recommended to select participants from different departments of the company.

High qualifications, extensive experience and specialized education for such employees will be huge advantages that will help quickly and accurately determine the condition of the goods being inspected, and then convey the correct conclusions to management.

If for some reason there are no such employees in the organization, the manager can include independent experts in the inspection commission.

Commission inspection report: sample 2021

Before completing the documentation, it is better to familiarize yourself with the inspection report of buildings and structures using a sample form that can be downloaded on the Internet. At the beginning, its name, place (city) and date of creation are written down.

After this, the following information is entered into the main part:

  • composition of the inspection commission : first, the names of the organizations whose representatives participated in the inspection are written down here, then the positions and initials of these employees. Among the members of the commission, there is a chairman, to whom a huge part of the responsibility for inspecting the house and drawing up the document is transferred;
  • the address of the object and its personal parameters (here you can indicate how many floors the object has, wall material, etc.);
  • the entire list of activities carried out during the process of technical inspection and monitoring (they can be presented either as a list or in the form of a plate), the conditions for their implementation;
  • if any disadvantages, damages, or defects , they must be described either in the act itself or in the usual appendix to it;
  • if the members of the commission group can immediately identify ways to eliminate the deficiencies found, then they are fully described in the document;
  • At the end, the commission's activities are summarized.

In the event that any of the commission members does not agree with any information, this must be highlighted as a separate paragraph in the form. Information about all documents attached to the document must also be included in the form.

If the act contains any laws or regulatory documentation (generally applicable or internal corporate), a link to them must be given in the form of a date and number. After filling out the report, all persons who participated in the inspection of the structure must put personal signatures on the documentation.

When to inspect goods in 2021

In 2021, the legislator has not established a strict list of situations when the parties to a transaction must necessarily draw up the document we are considering today. However, most often, the act is drawn up today:

  1. When the buyer receives the goods from the manufacturer or from the supplier;
  2. when inspecting and receiving goods after their manufacture;
  3. in case the buyer returns the goods (for example, if defects are detected).

ARTICLE RECOMMENDED FOR YOU:

Sample act of writing off receivables

Also, in fact, it does not matter what became the basis/reason for inspecting the goods. The main thing is to formalize the inspection process in accordance with the rules and requirements for such operations by the legislator. That is, by properly completing the inspection report of the goods.

Checking utility networks

Working with documents is not always easy. Certain systems are classified as utility networks:

  1. Water supply and sewerage.
  2. Heating system.
  3. Electricity.
  4. Ventilation.

Inspections of engineering type networks are aimed at determining the quality of equipment operation, its technical condition and functions. During its work, the commission examines the level of compliance of such networks with the requirements of various regulations and standards.

IMPORTANT! It must be remembered that performing such an examination has become the most effective method to help establish the physical wear and tear of electrical networks, water supply, sewerage, and so on.

Roof and roofing

The roof is designed to protect the structure from precipitation and maintain a suitable microclimate inside the structure. The commission must constantly inspect the roof in order to timely identify deficiencies and problems that may require expensive repairs. The roof is carefully inspected from the outside and inside.

It is necessary to check the coating patterns, the condition of the supporting products for its fastening and protective layers. The structure of the cornice and canopies, limiters, thickness and degree of wear of the insulation, sedimentary seams and fastening areas are also inspected.

Attic

An attic inspection is carried out to determine its compliance with technical requirements and the level of safety for the floors below.
If norms and standards are not followed during the creation of the attic, the result is excessive moisture throughout the house, which can lead to its slow destruction. During the inspection, the commission examines the integrity and quality of the floors, the absence of cracks on them, compliance of the thickness of the insulation with the standards, the level of vapor barrier, and the operation of the heating system.

Upon completion of the document being drawn up and endorsed by the signatures of all members of the commission, it is included in the package of documentation assigned to the object. The period of its storage is set either by current legislation or established by regulations of the organization.

Drawing up an inspection report in 2021

Even taking into account the wide variety of design options, many companies do not know how to draw up a product inspection report in 2021. At the same time, the simplest and most effective way, according to the lawyers of the Legal Ambulance website, is still to use samples for these purposes, which acted as a prerequisite for drawing up the acts in question until 2013.

The main thing is to correctly write down the information established as a result of the inspection on the form and, of course, to certify the form with the signatures of the parties . If the act is drawn up on the organization’s letterhead, it must be certified by the official seal of the company, if there is one.

Since there are two parties present during the inspection, the act is drawn up in at least two copies, which after signing will have equal legal force! If there are more parties, so many samples are drawn up so that each of them receives their own document.

In addition, if the organization acting as the buyer keeps an accounting journal, you need to enter data into it, drawn up an inspection report, the shelf life of which, according to current Russian legislation, is 3 years. In some cases, this period may be changed.